bridgelooki.blogg.se

Red bull arena
Red bull arena








red bull arena

Two existing kiosks in Sector D of the stadium have been revamped. It will also allow more elbow room to supporters. The demolition of the kiosks will make way for standing space in Sector B as part of plans to increase the capacity of Red Bull Arena. To enable the construction process to be a smooth one, the existing kiosks in Sector B of the venue is being pulled down to make way for the structural work of the new building of the Red Bull Arena.

red bull arena

Kiosks’ demolition (As on July 9 th, 2020) The new seating arrangement will enable one to transition from standing to seating and vice versa in matter of seconds depending on whether a national or international fixture is being staged in the stadium. During the 2020-21 seasons, changes in the seating set-up will be carried out. The seating arrangement will also be totally replaced once the coating and sealing work is through. To facilitate revamping it totally next year, coating and sealing work is on. In summer 2021, Sector B of the facility will enjoy a standing room.

red bull arena

Revamped seating (As on July 10 th, 2020) With the new bridges coming up on Level 7, it will be possible in the future to reach the upper tiers of Sectors A and C directly from the top of the wall. Precast concrete elements have been placed on the girders and are being covered with an additional layer of concrete to further bolster it. The steel girders are 50 cms high and serve as a substructure for the bridges. This will be followed by the shell of Level 6. Work is presently underway on the walls and ceilings of Level 5. A level transition from the new building to the existing area has been now made possible. The height of the ring extension building has already reached Level 5. Ring extension (As on August 20 th, 2020)










Red bull arena